| Back Page |
|---|
APD Serica - FabricationProject is to fabricate wellhead structures (Jacket) and Topside Structures for Glagah Kambuna Block, North Sumatera. The Fabrication was from March to December 2007. |
||||
|
![]() |
|||
|
![]() |
| Back Page |
|---|
APD Serica - FabricationProject is to fabricate wellhead structures (Jacket) and Topside Structures for Glagah Kambuna Block, North Sumatera. The Fabrication was from March to December 2007. |
||||
|
![]() |
|||
|
![]() |